FCU (Free cooling Unit)

SOW of Cooling project:
IVS (intelligent ventilation System)Supply, Installation
AC ,IVS PM and EM/CM
AC Compressor Supply and installation
AC & IVS Dismantle and reinstallation
IVS Controller & Fan supply, Repair and Replacement
AC & IVS trouble shooting

IVS (Intelligent ventilation System)

FCU(Free cooling Unit) /IVS(Intelligent ventilation System) Supply, Servicing and Maintenance

ZASS Technology

Major Work Area

  • 24X7 O&M for Full Passive maintenance services
  • Solar Power Equipment(Inverter, charge controller , PV panel etc.) supply, installation, commissioning and testing.
  • Supply & installation of BTS outdoor cabinet and Battery cabinet
  • Supply, installation & Support Service of Automatic Fire Protection System (AFPS)
  • Supply and installation of Battery and rectifier system.
  • Supply of Power System & BTS installation Accessories and Spares.

Banglalink FCU Project

Zass Technology was established in April 2005 in Bangladesh. Zass Technology is a locally incorporated Technologymunication systems vendor operating in Bangladesh.

Robi IVS Project

Zass Technology was established in April 2005 in Bangladesh. Zass Technology is a locally incorporated Technologymunication systems vendor operating in Bangladesh.